ProfitPlate

Restaurant Prime Cost Calculator

Prime cost is food plus labour — the two costs you actually control. Enter a week or a month of sales, cost of goods and payroll to see each as a share of sales, how you compare with restaurants like yours, and what it takes to get back inside the range.

Sales for the period

Food and drink, same period as the costs below
Blank = typical ceiling for your type

Cost of goods sold

Food + beverage used in the period. Leave blank to work it out from inventory.
All supplier invoices in the period

Labour

Kitchen and front of house
Managers, chef — include your own if you work shifts
Employer's share
Insurance, staff meals, uniforms

Prime cost

—

Cost of goods sold—
Labour, all in—
Prime cost—
Left for rent, overheads, profit—
Food cost % (healthy 28–35%)
—
Labour cost % (healthy 30–35%)
—
To hit 65%, cut spend by
—
…or grow sales to
—

What prime cost is and why it matters more than food cost

Prime cost is the sum of everything you sold (cost of goods — food, drink, packaging) and everyone you paid to sell it (all labour, including payroll taxes and benefits), expressed as a share of sales. It matters because these are the only two large costs you can change this week: rent, insurance and loan payments are fixed for months. A restaurant at 30% food cost can still be in trouble if labour runs at 40%, and a 36% food cost can be fine in a concept that runs very lean on staff. Looking at the two together is what the number is for.

COGS = opening inventory + purchases − closing inventory Prime cost = COGS + labour (wages + salaries + payroll taxes + benefits) Prime cost % = prime cost ÷ sales × 100 Cut needed = prime cost − sales × target %

What a healthy prime cost looks like

ConceptFood costLabourPrime cost ceiling
Full-service restaurant28–35%30–35%≈65%
Casual dining28–32%28–33%≈62%
Quick-service / fast casual25–30%25–30%≈60%
Pizza / takeaway25–30%22–28%≈58%
Café / bakery20–30%30–38%≈65%
Bar / pub20–25%25–32%≈60%
Fine dining30–38%32–40%≈70%

The rule of thumb across the industry is that prime cost should stay at or below 60% of sales for a quick-service operation and 65% for full service, leaving 35–40% for occupancy, overheads and a profit of 5–10%. Fine dining runs higher on both lines and makes it back on a higher average check. Treat the table as ranges, not verdicts: a new site in its first months, or one deliberately overstaffed for training, will sit above them for a while.

Actual results run hotter than the targets. The National Restaurant Association's 2025 Restaurant Operations Data Abstract (2024 data) puts the median food and beverage cost at 32.0% of sales for full-service restaurants and 32.4% for limited-service, median labour at 36.5% and 31.7%, and limited-service prime cost at 65 cents of every sales dollar; the full-service medians imply roughly 68%. Use the targets to price and schedule, and the medians to judge whether you are merely average.

Reading your result

If prime cost is over target, the result shows the money you would need to take out of food and labour at today's sales — or the sales you would need at today's spending. In practice the fix is usually some of both. On the food side the usual culprits are menu items whose cost has crept up since they were priced, over-portioning, and waste; on the labour side it is schedules built on hope rather than on last week's sales by hour. Measure weekly: a month is long enough to lose a serious amount of money before anyone notices.

Why "COGS from inventory" beats "purchases"

Purchases alone overstate cost in a week you stocked up and understate it when you ran stock down. Counting inventory at the start and end turns purchases into what you actually used. If you do not count stock, use purchases over a long enough period — a month at least — and accept the noise.

Figures last reviewed .

Sources: NRA, 2025 Restaurant Operations Data Abstract (food cost), NRA, 2025 Restaurant Operations Data Abstract (labour), Toast, Restaurant prime cost (2024), 7shifts, Restaurant prime cost guide (2026).

Frequently asked questions

What is a good prime cost percentage for a restaurant?

At or below 60% of sales for quick-service and 65% for full-service is the usual ceiling; fine dining can run to about 70%. A common split is roughly 30% cost of goods and 30% labour. Above those levels there is rarely enough left for rent, overheads and profit.

What counts as labour cost in prime cost?

Everything you pay to have people work: hourly wages, salaries (including a working owner's), overtime, the employer's share of payroll taxes, benefits, workers' compensation and staff meals. Leaving out salaried managers or payroll taxes is the most common reason prime cost looks healthier than it is.

How is prime cost different from food cost percentage?

Food cost percentage is only cost of goods divided by sales. Prime cost adds labour. Two restaurants with identical 30% food cost can be in very different health if one spends 25% on labour and the other 40%, which is why operators track prime cost as the headline number.

How often should I calculate prime cost?

Weekly is the standard for well-run operations, using a weekly inventory count or at least weekly purchases and payroll. Monthly is the minimum. The more often you measure, the smaller the problem is when you find it.

How do I lower prime cost quickly?

On the food line: reprice or re-engineer the dishes whose ingredient costs have risen, tighten portions and cut waste. On the labour line: schedule to last week's sales by hour, not to the roster you have always used. A two-point improvement on each line is worth four points of profit.